Your first energy storage system · step by step

Starting from scratch? We will guide you through the whole process

Investing in energy storage takes four steps – from checking how much it can earn to connecting it to the grid. At every stage you have one partner: us.

Step 1

Understand BESS as an investment

Use our calculator to see how much a stand-alone storage system can earn from price arbitrage and ancillary services in Poland.

Revenue calculator →
Step 2

Buy an RTB project

Choose a ready-to-build project with a grid connection offer and permits – instead of waiting years for paperwork.

RTB projects →
Step 3

Container storage and AC equipment

ZOE container systems from the exclusive distributor in Poland, together with the AC side: PCS, transformers and switchgear.

Container systems →
Step 4

Turnkey grid connection

Design, construction, grid connection and commissioning – one EPC contractor from start to finish.

EPC construction →

Not sure which step to start with?

Tell us about your idea – we will advise what to do first and what it may cost.